Skip to product information
1 of 8

Garage Slatwall Panel Wall Organizer

Garage Slatwall Panel Wall Organizer

Regular price $164.98 USD
Regular price Sale price $164.98 USD
Sale Sold out
Shipping calculated at checkout.

Product Overview

Combining multi-purpose design and long-term reliability, the Garage Slatwall Panel Wall Organizer - Slat Wall Paneling Sheets with Hooks, Interlocking PVC Panels for Tool Organization Mounted Storage Systems serves everyday cooking effectively. Built with Plastic, measuring 0.7"D x 48"W x 48"H, available in White. Notable features include kit includes and includes slats, contributing to its stainless character.

Key Features

  • Kit Includes: 4 x Slats(Each 12 x 48 In), 4 x J Trim Edging, Screws with drill bit, 8 x Hooks and Instructions. Providing coverage area of 4ft by 4ft (16 square feet total)
  • Universal Storage Solutions: Achieve an organized and efficient space with slat wall panels that seamlessly adjusts to various environments, delivering the ideal storage solution for every room, overcome storage obstacles, installation is straightforward, offering an efficient way to organize your space
  • Superior Slatwall: Slat wall paneling system constructed from robust commercial-grade PVC. Resistant to UV rays, stains, fire, chemicals, and oils, durability and immune to wear and tear. Say goodbye to fading, drying, cracking, and damage from water or moisture
  • Modular Customized: Slatwall panel features T-Channel design for easy adjustment of hooks and accessories. Change your configuration or add to it at any time, customize or expand storage to create personalized storage solutions, H-trim and F-trim in kit complete a seamless side-by-side connection
  • Multiple Options: Slatwall comes in White & Grey and many sizes and configurations as needed, conveniently store tools or create attractive displays in all sections of PVC wall panels. Quickly creater your ideal garage slat wall storage systems

Why Choose the GINCHAIN Garage Slatwall Panel Wall Organizer - Slat Wall Paneling Sheets with Hooks

For long-term panels & units use, the Garage Slatwall Panel Wall Organizer - Slat Wall Paneling Sheets with Hooks, Interlocking PVC Panels for Tool Organization Mounted Storage Systems offers compact build, kit includes, and consistent performance — a combination that pays off over time.

Best For

The GINCHAIN Garage Slatwall Panel Wall Organizer - Slat Wall Paneling Sheets with Hooks is best suited for: Dust Resistant, Rust Proof, Scratch Resistant.

Quick Summary

The GINCHAIN Garage Slatwall Panel Wall Organizer - Slat Wall Paneling Sheets with Hooks is a Panels & Units product by GINCHAIN. Material: Plastic. Color: White. Special Feature: Dust Resistant, Rust Proof, Scratch Resistant. Product Dimensions: 0.7"D x 48"W x 48"H. Shelf Type: Plastic.

Product Specifications

Specification Details
Material Plastic
Color White
Special Feature Dust Resistant, Rust Proof, Scratch Resistant
Product Dimensions 0.7"D x 48"W x 48"H
Shelf Type Plastic
Quantity

Low stock: 1 left

View full details